2020 Infrastructure Conference: Technology in Trucking and Management of Construction Materials
One of the greatest opportunities for driving efficiency on job sites, based on our 2019 contractor Benchmarking Survey, is in the reduction of delays due to time spent waiting on materials, receiving the wrong materials, and other disruptions due to challenges in supply chain management. In this session, Pace Davis, […]
November Smart Jobsites Call: Equipment Management Software Integration
The construction industry is currently in an environment of rapid technological change. Equipment Management Software integration is becoming an important aspect to manage that change for key stakeholders throughout the construction value chain.
BuiltWorlds Venture Forum Demo Drop – Propergate
ProperGate (propergate.co) is a smart collaboration platform that uses digital processes to optimise the handling of materials on complex construction sites. It intelligently connects logistics coordinators with the various trades, gate keepers and equipment operators working on-site, as well as off-site suppliers and the drivers that work for them.
Prefabrication Methods & Modularization Presentation: Victoria Navarro (Advocate Aurora Health) & Donald Flight (The Hill Group)
Donald Flight, Vice President, The Hill Group & Victoria Navarro, Regional Director of Planning Design & Construction, Advocate Aurora Health joined us for on our October Project Management Call focused on Prefabrication & Modularization. Check out the video below for their presentation made during the call.
Prefabrication Methods & Modularization Presentation: Mark Lamberson (Limbach Holdings) & Britton Langdon (MSuite)
Mark Lamberson, National VDC Manager, Limbach Holdings Inc. & Britton Langdon, CEO, MSuite joined us for on our October Project Management Call focused on Prefabrication & Modularization. Check out the video below for their presentation made during the call.
October Project Management Call: Prefabrication Methods & Modularization
What are the industry’s views on the importance of implementing pre-fabrication building methods? Has this attitude shifted in recent years? Modular buildings have also played a major recent role given COVID driven healthcare facility shortages and complications. What does the outlook on modular and prefab methods look like going forward?